The plan that will shape housing, transit, land use and the Yamuna for a capital of 3.2 crore people. Here is what it says, where it stands, and what is still open.
The draft 2041 plan sat with the Union housing ministry for more than three years. It was reworked, its horizon pushed to 2047 to match the Viksit Bharat target, and notified within eight days of DDA approval.
MPD-1962, MPD-2001 and MPD-2021 (notified in 2007) set the city's previous frameworks under the Delhi Development Act, 1957.
Around 33,000 suggestions and objections were received.
Sent to MoHUA on 13 April 2023. It was never notified.
Lt Governor Taranjit Singh Sandhu, as DDA chairperson, clears the renamed plan.
Unveiled by Union Minister Manohar Lal with the Lt Governor and Chief Minister Rekha Gupta.
DDA describes it as preliminary.
To be prepared for zones A to P after notification. None had been published as of October 2026.
Most new housing is planned inside the existing city through redevelopment and density near transit, with the rest from greenfield land pooling on the edges.
Minimum area to redevelop group, DDA and government housing is cut sharply. Expected to enable about 7 lakh additional units.
Affordable homes in TOD zones along Metro corridors.
Planned urban expansion on Delhi's periphery, with roads built first.
Housing interventions for JJ clusters across the city.
Incentive for rental homes for students, working professionals, migrant workers and low-income groups.
Industrial plots of 5,000 sq m or more can build housing for their workers.
Residential buildings regularised on an "as is where is" basis, without new layout plans.
A single redevelopment framework for ageing DDA plotted housing, much of it built under MPD-1962.
Housing estimates by source, in lakh units
These three published estimates add up to 37 lakh. The plan's 40 lakh headline also counts JJ, rental, high-density corridor and other provisions that have no separate figure.
About 207 sq km along Metro, RRTS and railway corridors is marked for higher-density, mixed-use development.
Either side of Metro corridors, and around RRTS and railway stations.
Commercial activity allowed on the ground and lower floors of eligible buildings.
Ageing markets can redevelop on small plots with incentive FAR. The earlier 4-hectare area requirement is waived.
A negative-list approach for residential, commercial and industrial zones, with online approvals.
Landowners in urbanising villages pool land. DDA builds trunk roads first, and the land is returned for development under set norms.
DDA develops roads of 30 m and wider upfront and serves as the anchor agency.
Set lower than the 400 that had been expected, which may let smaller consortiums take part.
A dense band inside the land-pooling area along the Urban Extension Road-II.
An alternative to pooling, with planning schemes on assembled land of at least 20 hectares.
Gadi Khasro and Ibrahimpur villages make up the first sector notified for implementation.
A uniform framework for the city's peripheral areas and notified LDRA villages. Farmhouses need plots of at least 2.5 acres.
The plan pairs network growth with a Unified Metropolitan Transport Authority to plan, run and enforce transport policy across agencies.
Rail network length, km
For intra-city and interstate connectivity, linked to the land-pooling road grid.
Connecting Metro, RRTS, buses, shared transport, walking and cycling.
Integrated planning, management and regulation of parking.
Night-time economy areas with 24-hour transport and planned cultural circuits.
The 9,934-hectare Yamuna O-Zone is split into two regulatory parts. The plan also covers green networks, net-zero building and about 1,500 heritage assets.
No concrete structures allowed.
Only recreational uses such as parks. A 52-km cycle track is proposed.
Protection and ecological restoration, with more sewage treatment and sewer lines.
Biodiversity parks, ecological corridors and native planting, plus rooftop solar, rainwater harvesting and water recycling.
Cultural Resource Management Plans and adaptive reuse as hotels, museums, offices and libraries.
Kartavya Path as a public and cultural space, and the Yuge Yugeen National Museum.
Zoning becomes more flexible so industrial areas can host logistics, data centres and start-ups.
Big-box retail, e-commerce, warehousing, co-working spaces and data centres.
Land reserved for public and private universities.
IT, start-ups, data centres and industrial parks near the airport.
GIS-based planning and online approvals, with 5G, optical fibre and command-and-control centres.
What has happened on the ground in the first three months. Last reviewed 10 November 2026.
DDA announces more than 20 stakeholder meetings through November with MPs, MLAs, industry bodies, RWAs, housing societies and landowners.
Under wayPreliminary GIS land-use map and an indicative road network plan for land-pooling zones P-I, P-II and N go online.
LiveMonth-long land-pooling awareness camps begin in villages. Sector 8B (Gadi Khasro, Ibrahimpur) is the first implementation-ready sector.
Under wayDeadline for landowners in 105 villages to express willingness to join land pooling.
OpenZonal Development Plans for zones A to P, and detailed development-code regulations.
AwaitedNGT-ordered scientific demarcation of the Yamuna 1-in-100-year floodplain between Wazirabad and Palla.
AwaitedExperts, environmental groups and developers have raised these points since the plan was approved.
Critics, including SANDRP, say splitting the O-Zone and allowing recreation in Zone II is premature while the NGT's floodplain demarcation is incomplete.
Some experts argue that higher FAR alone will not deliver homes for low-income households, pointing to the weak record of developer-led slum rehabilitation.
MPD-2021's local area plans were never notified and land pooling took years to start. Zonal plans and regulations will decide how much of MPD-2047 is delivered.
For buyers, investors and landowners
Tell us what you are looking for. The DMSN Realty team will contact you with options in TOD corridors, land-pooling sectors, redevelopment projects and commercial areas.
Prefer to talk? Call +91 88003 01296 or email info@dmsnrealty.com
MPD-2047 replaces the draft MPD-2041, which DDA approved in 2023 but which was never notified. The plan was reworked and its horizon extended to 2047.
Yes. It was notified on 20 August 2026. Many provisions still depend on Zonal Development Plans and regulations that DDA has yet to publish.
Use DDA's preliminary GIS land-use map in the MPD-2047 section of dda.gov.in, then confirm with DDA, since the map is labelled preliminary and zonal plans are pending.
Check DDA's land-pooling notices for your village and sector. For 105 villages, the window to express willingness to participate is open until 30 November 2026. Attend a DDA camp or contact DDA's land pooling cell before deciding.
The plan provides for regularising residential buildings in 1,511 unauthorised colonies "as is where is". Colonies in restricted areas such as the Yamuna O-Zone, the Ridge or ASI-protected areas may be treated differently. Check your colony's status with DDA.
Figures come from the official gazette and news reports from August to November 2026.